intermediate work · Authorized vacant house, Chandler Park Drive area, Detroit, MI 48213
Board and secure an open vacant house on a Detroit east side block
An open vacant house endangers every kid on the block and invites fire and stripping. Detroit's east side still has thousands of unsecured structures, and a clean plywood board-up on the ground-floor openings of a land-bank house keeps it stable until rehab or demolition. Standard: Detroit Land Bank Authority board-up practice + HUD vacant property securing guidance; SDG 11 Sustainable Cities and Communities. Proof: Photos of every ground-floor opening secured, worked from outside Method (Detroit Land Bank Authority board-up practice + HUD vacant property securing guidance; SDG 11 Sustainable Cities and Communities.): 1. Confirm the structure is land-bank or owner-authorized for board-up before touching it. 2. Measure each open ground-floor window and door from outside the structure. 3. Cut plywood to size and fix each panel over its opening from the exterior, screwed into the frame. 4. Do not enter the structure at any point; work only reachable openings from ground level. 5. Photograph every secured opening and the whole frontage with GPS and date on. Done when: Photos of every ground-floor opening secured, worked from outside
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 45–150 minutes. Method of record: Exterior building-envelope maintenance for existing housing -- gutter/downspout service, exterior debris removal, small envelope patch-and-seal, and foundation-grade moisture-source control. DOE Weatherization Assistance Program DIY-safe practice (envelope-adjacent) + EPA Healthy Homes moisture-control guidance; homeowner/occupant-safe hand-tool work only.
Bring
- camera
- gutter scoop or garden-hose gutter wand + bucket/tarp
- stepladder (6 ft max) + a spotter
- caulk gun + paintable/exterior sealant + patching compound
- rake, tarp, and yard-waste bags
- tape measure + line level or 4-ft level
- gloves + safety glasses
Steps
- 1. Photograph the gutter run, downspouts, exterior debris, and any envelope gaps or grading problem as found, from the vantage points that will be used again after.
- 2. Confirm scope with the occupant/owner and confirm the home's condition (post-1978, or pre-1978 with intact/unpainted-substrate work only -- any disturbed pre-1978 paint STOPS this scope and routes to an EPA RRP lead-safe pro).
- 3. From a stepladder no taller than 6 ft with a spotter (or from the ground for single-story eaves reachable by wand/scoop), clear debris from gutters and confirm downspouts drain freely and discharge at least several feet from the foundation; re-secure any loose gutter hangers.
- 4. Clear accumulated exterior debris/junk from the immediate building perimeter, porch, and walkway so drainage paths and pest-entry points stay clear; bag/stage yard waste for pickup.
- 5. Patch and seal small envelope gaps at trim, soffit, and utility penetrations with exterior-rated caulk or patching compound, and regrade a short run of soil away from the foundation where it currently slopes toward it.
- 6. Verify: gutters run clear water end-to-end, downspouts discharge away from the foundation, patched gaps are weathertight, and the perimeter is clear; photograph the finished work from the same vantage as the before photos.
- 7. Enter before/after photos, materials used, and any hazard flagged (active leak, structural rot, suspected lead paint) into the proof record; sign.
If it does not match the plan
- Pre-1978 home with peeling/chipping/disturbed paint on the work surface -> STOP: do not scrape or sand; route to an EPA RRP lead-safe certified pro.
- Active roof or plumbing leak, sagging gutter run, or structural rot found -> document and route to a licensed contractor; this scope is maintenance and prevention, not structural repair.
- Any ladder work above 6 ft, or an eave/gutter only reachable from the roof -> STOP this entry/intermediate scope; route to a credentialed crew.
What counts as done
- Before and after photos of gutters, downspouts, envelope gaps, and the cleared perimeter from matching vantage points
- Downspouts confirmed discharging away from the foundation (not pooling at the wall)
- Patched/sealed gaps are weathertight with no exposed raw gap remaining
- Perimeter debris cleared and staged/bagged for removal
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.