Anyone can start here · Our Lady of Guadalupe Parish campus (host-invited), 2020 E San Antonio Street, San Jose, CA 95116
Walk Our Lady of Guadalupe Parish in Mayfair and list its energy fixes
Our Lady of Guadalupe Parish has anchored San Jose's Mayfair neighborhood for generations — the church of the farmworker movement's East San Jose years — and like most older parish campuses it pays real money to leak heat through old lighting, drafty halls, and aging fixtures. A host-invited walkthrough with the facilities volunteer produces the prioritized fix list the following work orders execute. Standard: ENERGY STAR congregations facility-audit guidance; SDG 7 (Affordable and Clean Energy). Proof: Photo-documented audit sheet with ranked fixes Method (ENERGY STAR congregations facility-audit guidance; SDG 7 (Affordable and Clean Energy).): 1. Schedule the walkthrough with the parish office and cover the sanctuary, hall, kitchen, and classrooms. 2. Log lighting types and counts, draft points, thermostat settings, and water fixtures room by room. 3. Rank the five highest-return fixes with the facilities contact. 4. Leave the completed audit sheet with the parish. 5. Photograph key findings and the signed sheet. Done when: Photo-documented audit sheet with ranked fixes
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 60–120 minutes. Method of record: ASHRAE Level 1 energy audit
Bring
- tablet/clipboard
- tape measure
- light meter (lighting scope)
- clamp thermometer (refrigeration scope)
- 12-month utility bills
- camera
- ladder + spotter (high fixtures)
Steps
- 1. Confirm the address; arrange a staff escort for mechanical/back-of-house.
- 2. Photograph HVAC, lighting, envelope, and any in-scope systems.
- 3. Inventory systems: HVAC type + age; lighting fixture count/type/wattage; refrigeration units; envelope condition.
- 4. Summarize 12 months of utility use (kWh / therms) from the bills.
- 5. Take the in-scope measurements (light levels, unit temperatures, seal condition).
- 6. Rank no-cost/low-cost measures, then capital measures, with rough savings logic.
- 7. Enter inventory, measurements, utility summary, photos, and the ranked measure list; sign.
If it does not match the plan
- Knob-and-tube, ungrounded or overheated wiring, scorched outlets, or a hot electrical panel -> STOP: do not operate the circuit; route to a licensed electrician and restrict use (NEC / fire hazard).
- Gas odor, or a combustion appliance with absent/blocked venting (backdrafting / CO risk) -> STOP: evacuate, ventilate, call the gas utility. The agent escalates, never relights or adjusts gas.
- Any live-electrical/gas hazard -> document, do not touch, flag for a licensed pro.
- Refrigeration unit out of food-safe range -> flag as both energy and food-safety risk.
- Suspected asbestos/lead in materials -> flag and stop.
What counts as done
- System inventory complete for the in-scope equipment
- 12-month utility use summary recorded
- In-scope measurements recorded with units
- Ranked no-cost/low-cost + capital measure list produced
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.