Anyone can start here · Public sidewalks, Cesar E. Chavez Pkwy at Harbor Dr, San Diego, CA 92113

Keep a weekly photo log of truck and shipyard air along the Barrio Logan fenceline (2026-07-18)

Barrio Logan sits pressed between working shipyards, the Interstate 5 corridor, and port truck routes, and state screening ranks its pollution burden in California's top tier. Residents smell diesel daily but the record of idling trucks, visible plumes, and dust events is thin. A steady, dated photo log from public sidewalks gives neighbors standing evidence for the state's community air protection program. Standard: CARB AB 617 Community Air Protection (Portside communities) โ€” SDG 11. Proof: Dated photo log from the fixed public route with notes Method (CARB AB 617 Community Air Protection (Portside communities) โ€” SDG 11.): 1. Walk the same public sidewalk route along Cesar E. Chavez Parkway and Harbor Drive each week at a consistent hour. 2. Photograph idling trucks, visible exhaust plumes, uncovered loads, and dust events from the sidewalk. 3. Note the time, wind direction, and any strong odors in a simple written log entry for each photo. 4. Upload the week's photos and log with GPS location and date stamps to close the record. Done when: Dated photo log from the fixed public route with notes

Where
Public sidewalks, Cesar E. Chavez Pkwy at Harbor Dr, San Diego, CA 92113
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Dated photo log from the fixed public route with notes

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-07-25

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45โ€“90 minutes. Method of record: EPA NAAQS community ambient-air screening (PM2.5)

Bring

Steps

  1. 1. Choose >=3 points (near-source/roadside, mid, background); record GPS at each; stay off the roadway.
  2. 2. Photograph each monitoring location.
  3. 3. Log PM2.5 (ug/m3) at each point over a comparable peak period.
  4. 4. Record wind direction, time, and nearby source activity (e.g., truck traffic).
  5. 5. Compare readings to the NAAQS reference.
  6. 6. Enter the PM2.5 logs, wind/time, source note, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.