Anyone can start here · Alleys and canyon edges near Imperial Ave and Euclid Ave, San Diego, CA 92114
Log the illegal dumping hot spots along Southeast San Diego's alleys and canyons (2026-07-18)
Mattresses, tires, and construction debris pile up along Imperial Avenue's side alleys and the canyon rims of Southeast San Diego far faster than the city's request line clears them. A monthly photographed sweep that files each pile with the city's Get It Done system turns invisible blight into tracked tickets. Standard: City of San Diego Get It Done reporting and SDG 11 sustainable communities. Proof: Photo log with filed ticket numbers Method (City of San Diego Get It Done reporting and SDG 11 sustainable communities.): 1. Walk or drive a fixed route of known dumping corridors monthly. 2. Photograph each pile from the public right-of-way with a landmark in frame. 3. File each site through the city's public reporting system and record the ticket number. 4. Upload the photo set, locations, and ticket list with GPS and date. Done when: Photo log with filed ticket numbers
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: SDG-aligned community needs identification + intake (programmatic 311 front door) — maps a named local ecological or social need to a specific SDG target, a real place, and an actionable protocol intake, using photo + GPS + community input + a named referral target
Bring
- GPS-capable phone (GPS waypoint + photos required)
- note-taking app or paper for community impact statements
- camera (photo documentation of the unmet need)
- internet access for the named program / intake lookup (city portal, USDA atlas, state database)
- copy of the posted intake criteria (SDG, lane, named intake target)
Steps
- 1. Navigate to the named location; confirm GPS is inside the posting radius; record the GPS waypoint.
- 2. Photograph the current state of the unmet need (the gap, the condition, the absence) with a clear timestamp — the photo must show what is missing or failing, not just a streetview-style shot.
- 3. Document the community impact: record at minimum one household or resident account of how the need affects daily life; note the population affected (households, block, facility) and the primary harm (health risk, access barrier, safety hazard, environmental degradation).
- 4. Map the need to a named SDG target: record the SDG number and target (e.g. SDG 11.7, SDG 6.1, SDG 2.1, SDG 11.1) and confirm the need matches the target's scope.
- 5. Identify the vertical lane the work belongs to: housing (renovation/healthy-home), food (provenance/delivery), water, urban-canopy, or the appropriate ecological lane — state which existing protocol work type would provision the solution.
- 6. Look up and record the named intake target — the specific program, agency, or case queue the need should be routed to (e.g. city work-order URL, federal program intake, lead service line replacement registry); document the current gap between the need and the intake.
- 7. Compile the intake record: GPS, photos, SDG tag, community impact note, vertical lane, named intake target, and any program reference numbers; sign it as the identifying worker.
If it does not match the plan
- Need cannot be GPS-confirmed on-site (remote or inaccessible location) -> document the reason; do not claim on-site verification; the intake is still useful but must be labelled 'remote identification, unverified on-site'.
- No community impact statement obtainable -> the intake may still be useful as an environmental observation, but the intake should note 'no resident impact confirmed'; the protocol prefers lived-experience evidence for SDG need intakes.
- Multiple SDG targets apply to a single need -> record all applicable targets; the primary one is the most proximate (the most direct unmet need, not the upstream cause).
- Regulated work required to address the need (e.g. water testing, electrical, abatement, structural) -> route to the appropriate licensed-pro lane; the intake documents and refers, never attempts the regulated work.
What counts as done
- GPS waypoint inside the posting radius with timestamped photo showing the unmet need
- Community impact statement: at least one named household or resident account of the harm
- SDG target recorded with number + target (e.g. SDG 11.1 adequate housing), matched to the need
- Named intake target: a specific program, agency, or work queue the packet can be routed to
- Vertical lane identified: housing / food / water / urban-canopy / other protocol lane
- The intake record is actionable — a coordinator can hand it to the correct program without re-investigating
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.