Anyone can start here · Public trail edge, Tijuana River Valley Regional Park staging area off Hollister St, San Diego, CA 92154

Record the monthly litter and debris transect along the river valley trail edge (2026-07-18)

Storm flows strand plastic, tires, and sediment banks through the Tijuana River Valley's trail corridors, and cleanup agencies prioritize by documented density. A monthly photographed transect from the dry public trail — counting debris types in fixed segments without touching anything — feeds that prioritization with real numbers. Standard: Tijuana River Valley cleanup prioritization and CWA trash policy monitoring — SDG 6. Proof: Segment tally sheet with photos Method (Tijuana River Valley cleanup prioritization and CWA trash policy monitoring — SDG 6.): 1. Walk the fixed trail transect segments on dry ground only. 2. Count and categorize visible debris per segment on the tally sheet without touching any item. 3. Photograph each segment's representative debris field. 4. Upload tallies and photos with GPS and date. Done when: Segment tally sheet with photos

Where
Public trail edge, Tijuana River Valley Regional Park staging area off Hollister St, San Diego, CA 92154
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Segment tally sheet with photos

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-08-17

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–60 minutes. Method of record: EPA dry-weather / AMD field screening

Bring

Steps

  1. 1. Navigate to the outfall/reach; record GPS; photograph it, capturing any visible flow or staining.
  2. 2. Note whether flow is present in dry weather (yes/no).
  3. 3. Measure and record pH, conductivity, and each specified analyte per kit instructions.
  4. 4. Log any color, odor, floc, or aquatic-life observation.
  5. 5. Enter all readings with units, GPS, time, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.