Anyone can start here · Invited homes near Broadway and Lemon Grove Ave, Lemon Grove, CA 91945
Walk the weatherization checklist through invited older Lemon Grove homes
Lemon Grove's postwar bungalows mostly predate any insulation standard, and the households in them pay some of the county's highest energy burdens relative to income. A room-by-room readiness survey — drafts, attic access, ducts, moisture — hands each family a prioritized fix list and feeds the follow-up sealing work. Standard: DOE Weatherization Assistance Program intake checklist — SDG 7. Proof: Photo-backed readiness checklist per home Method (DOE Weatherization Assistance Program intake checklist — SDG 7.): 1. Confirm the occupant's invitation and walk the home with the readiness checklist. 2. Record drafts, attic and crawl access, duct condition visible from living space, and moisture signs. 3. Photograph each finding and rank fixes cheapest first. 4. Deliver the list to the occupant and upload it with photos, GPS, and date. Done when: Photo-backed readiness checklist per home
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 75–150 minutes. Method of record: Weatherization readiness survey (DOE WAP field practice + ENERGY STAR Home Upgrade; BPI combustion-safety-first sequencing; LBC Energy petal; observation/planning only)
Bring
- camera
- tape measure + flashlight (attic/crawl/basement/rim joist)
- low-cost CO monitor (spot screening at combustion appliances)
- incense stick or smoke pencil (qualitative draft tracing, no blower door)
- tablet/clipboard with the weatherization-readiness checklist
- thermal/IR camera (optional, insulation-gap scope)
Steps
- 1. Confirm scope with the household and record what they actually feel: the cold rooms, the drafts, the winter bill they want lower. Their comfort targets frame the package — this is their claim of a warmer home, not a generic energy audit.
- 2. Inventory the envelope by assembly with photos: attic insulation presence + approximate depth/R-level, accessible wall/floor/rim-joist insulation, window/door condition and weatherstripping, and visible bypasses (top plates, chases, recessed lights, attic hatch).
- 3. Trace drafts qualitatively (smoke pencil/incense at suspect points on a breezy day or with exhaust fans running) and rank the air-sealing targets; note that quantitative blower-door verification belongs to the weatherization contractor.
- 4. Screen combustion safety BEFORE tightening is planned: photograph each combustion appliance + venting, take a CO spot reading, and flag anything (orphaned water heater, corroded flue, suspected backdrafting) that a BPI-qualified pro must clear before ANY air-sealing proceeds.
- 5. Check moisture prerequisites: any active leak, bulk-water entry, or damp assembly gets sequenced ahead of insulation (never insulate a wet assembly), and note ventilation needs after tightening (bath/kitchen exhaust, fresh-air strategy).
- 6. Assemble the weatherization-readiness package: ranked air-sealing targets, insulation gaps by assembly with rough quantities, combustion-safety flags that gate the work, moisture prerequisites, ventilation-after-tightening notes, and the utility/WAP program paths the household may qualify for.
- 7. Enter photos, GPS/address, the assembly inventory, CO readings, and the readiness package; sign. Route combustion clearance to a BPI-qualified pro and installation to insured insulation contractors — the survey scopes, it never installs.
If it does not match the plan
- CO spot reading >9 ppm, an orphaned/corroded flue, or suspected backdrafting -> the package is GATED: no air-sealing or insulation item proceeds until a BPI-qualified pro clears combustion safety; route immediately.
- Active leak, bulk-water entry, or a damp/wet assembly -> sequence moisture control FIRST; never scope insulation over a wet assembly.
- Vermiculite or suspect asbestos insulation in the attic, or pre-1978 deteriorated paint at work surfaces -> do not disturb; mark affected items licensed-abatement / EPA-RRP-only.
- Knob-and-tube or exposed/scorched wiring in an assembly slated for insulation -> flag stop-work on insulating that assembly; a licensed electrician clears it first.
What counts as done
- Household comfort targets (cold rooms, drafts, bill pain) recorded and used to frame the package
- Envelope inventoried by assembly (attic/wall/floor/rim + windows/doors) with photos and approximate R-levels where visible
- Combustion appliances photographed with CO spot readings; every tightening-gate flag named for a BPI-qualified pro
- Weatherization-readiness package delivered: ranked air-sealing targets, insulation gaps w/ rough quantities, moisture prerequisites, ventilation-after-tightening notes, and candidate utility/WAP program paths
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.