Anyone can start here · Invited homes near S Main Ave and Alvarado St, Fallbrook, CA 92028

Photograph the home ignition zones of invited Fallbrook properties

Fallbrook's avocado-country homes sit inside chaparral that state maps rate among the highest fire-hazard severity zones in San Diego County, and wind-blown embers take houses through the small fuels touching them. A photographed walk of each invited home's first hundred feet — dry grass, wood piles, vent screens, mulch against siding — produces the exact task list that protects it. Standard: CAL FIRE Defensible Space (PRC 4291) inspection checklist — SDG 15. Proof: Zone-by-zone photo checklist per home Method (CAL FIRE Defensible Space (PRC 4291) inspection checklist — SDG 15.): 1. Confirm the occupant's invitation and walk the zones from the structure outward to 100 feet or the lot line. 2. Photograph fuels against the structure, under decks, in gutters, and across the first 30 feet. 3. Note vent screening, wood piles, and dry-grass areas on the checklist. 4. Deliver the ranked task list to the occupant and upload it with photos, GPS, and date. Done when: Zone-by-zone photo checklist per home

Where
Invited homes near S Main Ave and Alvarado St, Fallbrook, CA 92028
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Zone-by-zone photo checklist per home

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: NFPA 1144 / Firewise USA structure-ignition-zone defensible-space assessment — documentation-only from a safe public/yard vantage

Bring

Steps

  1. 1. Document only — photograph Zone 0 (0-5 ft from the structure), Zone 1 (5-30 ft) and Zone 2 (30-100 ft) from the driveway or yard edge; never enter dense brush or approach a structurally questionable outbuilding.
  2. 2. Note vegetation type, spacing and ladder-fuel presence (brush touching tree canopy) in each zone from the safe vantage.
  3. 3. Photograph the roof material, gutters, vents, and any firewood or combustible material stacked against the structure.
  4. 4. Compile the zone-by-zone findings into a defensible-space checklist naming what a licensed/credentialed vegetation-management crew should clear first; never clear, cut, or move anything during this survey.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.