intermediate work · Invited homes near N Main Ave and Elder St, Fallbrook, CA 92028

Fit fine-mesh ember screens on the vents of invited Fallbrook homes

Most homes lost to wind-blown embers ignite from inside — embers ride the wind through quarter-inch attic and crawl vents and land in dry insulation. Swapping each invited home's vent screens to eighth-inch metal mesh is a ground-reach afternoon that closes the front door embers use. Standard: CAL FIRE ember-resistant venting guidance (Chapter 7A norms) — SDG 11. Proof: Before/after photos per vent Method (CAL FIRE ember-resistant venting guidance (Chapter 7A norms) — SDG 11.): 1. Confirm the occupant's invitation and count every reachable foundation and gable vent below 6 ft. 2. Cut eighth-inch galvanized mesh to size for each vent. 3. Fasten the mesh over each vent frame without blocking airflow. 4. Photograph each screened vent before and after with GPS and date. Done when: Before/after photos per vent

Where
Invited homes near N Main Ave and Elder St, Fallbrook, CA 92028
Pay
$70 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Before/after photos per vent

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: NFPA 1144 / Firewise USA structure-ignition-zone defensible-space assessment — documentation-only from a safe public/yard vantage

Bring

Steps

  1. 1. Document only — photograph Zone 0 (0-5 ft from the structure), Zone 1 (5-30 ft) and Zone 2 (30-100 ft) from the driveway or yard edge; never enter dense brush or approach a structurally questionable outbuilding.
  2. 2. Note vegetation type, spacing and ladder-fuel presence (brush touching tree canopy) in each zone from the safe vantage.
  3. 3. Photograph the roof material, gutters, vents, and any firewood or combustible material stacked against the structure.
  4. 4. Compile the zone-by-zone findings into a defensible-space checklist naming what a licensed/credentialed vegetation-management crew should clear first; never clear, cut, or move anything during this survey.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.