Anyone can start here · Host-invited congregation building, W Center Street area, Milwaukee, WI 53206

Fit low-flow fixtures through an invited congregation building

Congregation kitchens and washrooms serve crowds on old full-flow fixtures, and the water bill quietly eats mission money. Swapping aerators and showerheads for low-flow units through the building is an hour's work that saves for years. Standard: EPA WaterSense fixture standard; SDG 6 Clean Water and Sanitation. Proof: Photo of each swapped fixture with its WaterSense label Method (EPA WaterSense fixture standard; SDG 6 Clean Water and Sanitation.): 1. Confirm the congregation host's invitation and list every faucet and showerhead. 2. Swap aerators and showerheads for WaterSense-labeled low-flow units, hand-tight with tape on threads. 3. Check each fixture for drips after the swap. 4. Record fixture count and locations. 5. Photograph each new fixture and its label with GPS and date on. Done when: Photo of each swapped fixture with its WaterSense label

Where
Host-invited congregation building, W Center Street area, Milwaukee, WI 53206
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of each swapped fixture with its WaterSense label

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45โ€“90 minutes. Method of record: EPA WaterSense fixture flow-rate + leak audit

Bring

Steps

  1. 1. Confirm the address; get a staff escort; photograph each fixture group.
  2. 2. Measure flow rate at each faucet/shower with the bag-and-timer method; record gallons per minute (gpm).
  3. 3. Test each toilet for leaks with a dye tablet (wait 10 min, check for color in the bowl); record flush volume.
  4. 4. Inspect fixtures, meters, and irrigation for visible leaks/drips; note each.
  5. 5. Read the water meter with all fixtures off; note any movement (indicates a hidden leak).
  6. 6. Rank WaterSense fixture upgrades + leak repairs by estimated water/cost savings.
  7. 7. Record flow rates, leak results, meter check, ranked measures, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.