Anyone can start here · Invited rowhouses, Oliver Street area, Ironbound, Newark, NJ 07105

Weatherstrip the leaky doors and windows of an invited Ironbound rowhouse

The Ironbound's dense pre-war rowhouses leak heat all winter through door and window gaps, and gas bills eat into rent-burdened households. A roll of weatherstrip and a door sweep per home is the fastest energy poverty relief available, and it also keeps outdoor air pollution from drifting indoors. Standard: DOE Weatherization Assistance Program low-cost measures list; SDG 7. Proof: Before/after photos per sealed opening plus a count Method (DOE Weatherization Assistance Program low-cost measures list; SDG 7.): 1. Confirm the occupant invitation and walk the home marking every draft point at doors and windows. 2. Clean each surface and apply the correct weatherstrip profile to door jambs and window sashes. 3. Install a door sweep on each exterior door with a visible floor gap. 4. Test each door and window for smooth closing and re-seat any strip that binds. 5. Photograph each sealed opening before and after with GPS and date. Done when: Before/after photos per sealed opening plus a count

Where
Invited rowhouses, Oliver Street area, Ironbound, Newark, NJ 07105
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Before/after photos per sealed opening plus a count

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–120 minutes. Method of record: US DOE Weatherization Assistance Program DIY-safe air-sealing measures + ENERGY STAR DIY Guide to Sealing and Insulating. Occupant-safe caulk/weatherstrip work only; no combustion, electrical, insulation-removal, or pre-1978 paint disturbance.

Bring

Steps

  1. 1. Photograph each draft location (window trim, door, outlet, penetration) before sealing.
  2. 2. Confirm the home is post-1978 or the surfaces are lead-safe; if pre-1978 with disturbed paint, STOP and flag for a lead-safe pro.
  3. 3. Clean and dry each gap; remove old failed caulk/weatherstrip with the putty knife.
  4. 4. Apply a continuous caulk bead to fixed gaps (window/door trim, penetrations) and tool it smooth.
  5. 5. Install weatherstripping on operable window/door edges so it compresses without binding the sash/door.
  6. 6. Fit door sweeps to exterior doors and foam gaskets behind outlet/switch plates on exterior walls.
  7. 7. Verify each treated opening closes/latches and the seal is continuous; photograph the finished work.
  8. 8. Enter locations sealed, materials used, before/after photos, and any flagged hazard into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.