Anyone can start here · Orangi Town self-built lane drain, Karachi 75800

Record Orangi Town lane drain condition from the dry lane surface (2026-07-18)

Orangi's self-built sanitary lane drains, developed through the community-financed Orangi Pilot Project starting in the 1980s, remain one of the world's most studied low-cost sanitation models — but their day-to-day condition is rarely documented block by block. A photo record from the dry lane surface, without touching or entering any drain, tracks where maintenance is most needed. Standard: UN-Habitat urban drainage guidance + SDG 11.5 / SDG 6.6. Proof: Photo + GPS + written condition log from the dry lane surface Method (UN-Habitat urban drainage guidance + SDG 11.5 / SDG 6.6.): 1. Walk only the dry lane surface — never enter, open, or touch any drain. 2. Photograph the drain cover and surrounding lane condition from a safe standing position. 3. Record GPS coordinates, date, and a plain-language description of visible condition. 4. Note any overflow or blockage without approaching or touching it. 5. Submit the photos and notes as your proof — a trained crew handles any drain work. Done when: Photo + GPS + written condition log from the dry lane surface

Where
Orangi Town self-built lane drain, Karachi 75800
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo + GPS + written condition log from the dry lane surface

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-08-17

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.