intermediate work · Invited surveyed homes, Hazard, KY 41701
Set up dehumidifiers and drying airflow in surveyed dry-ready Hazard homes
For the surveyed Hazard homes with damp but no active growth, a properly sized dehumidifier with a working drain routine and cross-ventilation can stop the decline before it becomes a remediation job. This rung installs drying capacity only where the survey cleared the rooms. Standard: EPA moisture control guidance for homes; SDG 3 + SDG 11. Proof: Photos of unit placement, drain route, and settings plus the handoff Method (EPA moisture control guidance for homes; SDG 3 + SDG 11.): 1. Confirm the occupant invitation and that the survey cleared the rooms of active growth. 2. Place and level the dehumidifier per its clearances and set the drain hose to a working drain point. 3. Set target humidity and show the occupant the empty-and-clean routine. 4. Open a cross-ventilation path and check airflow with a tissue test. 5. Photograph the placed unit, drain route, and settings with GPS and date. Done when: Photos of unit placement, drain route, and settings plus the handoff
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 75โ150 minutes. Method of record: Weatherization readiness survey (DOE WAP field practice + ENERGY STAR Home Upgrade; BPI combustion-safety-first sequencing; LBC Energy petal; observation/planning only)
Bring
- camera
- tape measure + flashlight (attic/crawl/basement/rim joist)
- low-cost CO monitor (spot screening at combustion appliances)
- incense stick or smoke pencil (qualitative draft tracing, no blower door)
- tablet/clipboard with the weatherization-readiness checklist
- thermal/IR camera (optional, insulation-gap scope)
Steps
- 1. Confirm scope with the household and record what they actually feel: the cold rooms, the drafts, the winter bill they want lower. Their comfort targets frame the package โ this is their claim of a warmer home, not a generic energy audit.
- 2. Inventory the envelope by assembly with photos: attic insulation presence + approximate depth/R-level, accessible wall/floor/rim-joist insulation, window/door condition and weatherstripping, and visible bypasses (top plates, chases, recessed lights, attic hatch).
- 3. Trace drafts qualitatively (smoke pencil/incense at suspect points on a breezy day or with exhaust fans running) and rank the air-sealing targets; note that quantitative blower-door verification belongs to the weatherization contractor.
- 4. Screen combustion safety BEFORE tightening is planned: photograph each combustion appliance + venting, take a CO spot reading, and flag anything (orphaned water heater, corroded flue, suspected backdrafting) that a BPI-qualified pro must clear before ANY air-sealing proceeds.
- 5. Check moisture prerequisites: any active leak, bulk-water entry, or damp assembly gets sequenced ahead of insulation (never insulate a wet assembly), and note ventilation needs after tightening (bath/kitchen exhaust, fresh-air strategy).
- 6. Assemble the weatherization-readiness package: ranked air-sealing targets, insulation gaps by assembly with rough quantities, combustion-safety flags that gate the work, moisture prerequisites, ventilation-after-tightening notes, and the utility/WAP program paths the household may qualify for.
- 7. Enter photos, GPS/address, the assembly inventory, CO readings, and the readiness package; sign. Route combustion clearance to a BPI-qualified pro and installation to insured insulation contractors โ the survey scopes, it never installs.
If it does not match the plan
- CO spot reading >9 ppm, an orphaned/corroded flue, or suspected backdrafting -> the package is GATED: no air-sealing or insulation item proceeds until a BPI-qualified pro clears combustion safety; route immediately.
- Active leak, bulk-water entry, or a damp/wet assembly -> sequence moisture control FIRST; never scope insulation over a wet assembly.
- Vermiculite or suspect asbestos insulation in the attic, or pre-1978 deteriorated paint at work surfaces -> do not disturb; mark affected items licensed-abatement / EPA-RRP-only.
- Knob-and-tube or exposed/scorched wiring in an assembly slated for insulation -> flag stop-work on insulating that assembly; a licensed electrician clears it first.
What counts as done
- Household comfort targets (cold rooms, drafts, bill pain) recorded and used to frame the package
- Envelope inventoried by assembly (attic/wall/floor/rim + windows/doors) with photos and approximate R-levels where visible
- Combustion appliances photographed with CO spot readings; every tightening-gate flag named for a BPI-qualified pro
- Weatherization-readiness package delivered: ranked air-sealing targets, insulation gaps w/ rough quantities, moisture prerequisites, ventilation-after-tightening notes, and candidate utility/WAP program paths
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.