Anyone can start here · Invited hillside homes, Hazard, KY 41701
Redirect the downspouts of invited Hazard homes away from slopes and foundations
Hazard's homes climb the same slopes that failed in the flood years, and downspouts dumping at the foundation keep those slopes saturated. Redirecting each spout's discharge to safe drainage is small work that subtracts real risk on a hillside street. Standard: HUD Healthy Homes site drainage + KY stormwater practice; SDG 11. Proof: Before/after photo per redirected downspout Method (HUD Healthy Homes site drainage + KY stormwater practice; SDG 11.): 1. Confirm the occupant invitation and check each downspout's discharge point. 2. Fit elbows, extensions, or splash blocks routing water at least four feet out toward street drainage. 3. Secure fittings against storm movement and verify positive fall. 4. Confirm no discharge crosses onto the slope face or a neighbor's lot. 5. Photograph each redirected outlet before and after with GPS and date. Done when: Before/after photo per redirected downspout
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)
Bring
- measuring tape
- GPS phone
- camera
- trowel / probe
- data sheet
- gloves
Steps
- 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
- 2. Photograph the asset, its inlet, and its outlet/overflow.
- 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
- 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
- 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
- 6. Note erosion, bypass, or structural damage and list the maintenance needed.
- 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.
If it does not match the plan
- Standing water persists > 48h after rain -> flag failed infiltration (clogged media) for rehab.
- Inlet or outlet blocked -> flag for cleaning; the asset isn't capturing runoff.
- Erosion, undercutting, or flow bypassing the asset -> flag for repair.
- Documentation only — no digging out media or altering structures.
What counts as done
- Asset type + overall condition recorded
- Inlet + outlet clear/blocked status recorded
- Standing-water / infiltration observation recorded
- Sediment/trash level + maintenance recommendations + GPS + photos
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.