Anyone can start here · Public bank path, Guadalupe River, Barangay Guadalupe, Cebu City, Philippines

Log the Guadalupe River high-water mark near Barangay Guadalupe housing (2026-07-18)

The Guadalupe River through Cebu City floods low-lying housing in Barangay Guadalupe during heavy monsoon rain, and the community has no simple repeated record of how high the water actually reaches each event. A dry-path visual log builds the evidence base for a drainage improvement request. Standard: UN-Habitat urban flood-risk monitoring guidance; SDG 11.5 (reduce disaster impacts). Proof: Timestamped waterline photo + log Method (UN-Habitat urban flood-risk monitoring guidance; SDG 11.5 (reduce disaster impacts).): 1. Stand on the dry public bridge or bank path at the marked observation point. 2. Photograph the waterline against the fixed reference mark. 3. Record date, time, and rainfall condition. 4. Note any visible channel blockage from the public vantage point. 5. Submit the photo and log entry. Done when: Timestamped waterline photo + log

Where
Public bank path, Guadalupe River, Barangay Guadalupe, Cebu City, Philippines
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Timestamped waterline photo + log

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-07-25

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: FEMA floodplain + green-infrastructure siting screen

Bring

Steps

  1. 1. Confirm post-event conditions are safe; navigate to the site; record GPS.
  2. 2. Photograph deposited sediment / affected area.
  3. 3. Measure deposition depth at representative points.
  4. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values.
  5. 5. Note debris, hazards, and the extent (sketch).
  6. 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.