Anyone can start here · Canal-adjacent lane, Kenh Doi, Ward 9, District 8, Ho Chi Minh City, Vietnam

Log the flood-stage water line along a Kenh Doi canal-adjacent lane (2026-07-18)

District 8's Kenh Doi canal-front lanes flood during heavy monsoon rain and high tide combined, an increasingly common event as the canal's stilt-housing stretches get squeezed by rising water. A dry-path visual log gives the ward a real record of flood depth and frequency. Standard: UN-Habitat urban flood-risk monitoring guidance; SDG 11.5 (reduce disaster impacts). Proof: Timestamped waterline photo + log Method (UN-Habitat urban flood-risk monitoring guidance; SDG 11.5 (reduce disaster impacts).): 1. Stand on dry raised pavement at the marked observation point during or right after rain. 2. Photograph the waterline against the fixed reference mark. 3. Record date, time, and rainfall/tide condition. 4. Note any visible drainage blockage from the public vantage point. 5. Submit the photo and log entry. Done when: Timestamped waterline photo + log

Where
Canal-adjacent lane, Kenh Doi, Ward 9, District 8, Ho Chi Minh City, Vietnam
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Timestamped waterline photo + log

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-07-25

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: FEMA floodplain + green-infrastructure siting screen

Bring

Steps

  1. 1. Confirm post-event conditions are safe; navigate to the site; record GPS.
  2. 2. Photograph deposited sediment / affected area.
  3. 3. Measure deposition depth at representative points.
  4. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values.
  5. 5. Note debris, hazards, and the extent (sketch).
  6. 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.