Anyone can start here · Settlement road, Raiwaqa, Suva, Fiji

Log the king-tide flood line at Raiwaqa's low-lying settlement road (2026-07-18)

Suva's low-lying settlements like Raiwaqa now flood on ordinary king tides, not just storms, as Pacific sea levels rise — a pattern regional climate bodies have documented for years. A dry-path visual log gives residents a real, repeated record of how far the water reaches on each king tide. Standard: UN-Habitat/Pacific Islands Forum coastal flood-risk monitoring guidance; SDG 13.1 (strengthen resilience to climate hazards). Proof: Timestamped waterline photo + log Method (UN-Habitat/Pacific Islands Forum coastal flood-risk monitoring guidance; SDG 13.1 (strengthen resilience to climate hazards).): 1. Stand on dry raised ground at the marked observation point during the king tide window. 2. Photograph the waterline against the fixed reference mark. 3. Record date, time, and tide stage. 4. Note any visible drainage blockage from the public vantage point. 5. Submit the photo and log entry. Done when: Timestamped waterline photo + log

Where
Settlement road, Raiwaqa, Suva, Fiji
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Timestamped waterline photo + log

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-07-25

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: FEMA floodplain + green-infrastructure siting screen

Bring

Steps

  1. 1. Confirm post-event conditions are safe; navigate to the site; record GPS.
  2. 2. Photograph deposited sediment / affected area.
  3. 3. Measure deposition depth at representative points.
  4. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values.
  5. 5. Note debris, hazards, and the extent (sketch).
  6. 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.