Anyone can start here · Curb inlets, central Wasco residential grid, Wasco, CA 93280

Stencil the storm drains in central Wasco so nothing but rain goes down

Wasco's storm drains run toward the Poso Creek drainage, and every dumped bucket of oil or paint rides the next rain into it. Most people simply don't know the curb inlet isn't a sewer. A clear bilingual stencil at each inlet is the cheapest form of watershed protection there is. Standard: EPA NPDES stormwater public-education practice; SDG 6 Clean Water, SDG 14 Life Below Water. Proof: Photo per stenciled inlet plus location log with GPS/date Method (EPA NPDES stormwater public-education practice; SDG 6 Clean Water, SDG 14 Life Below Water.): 1. Map the assigned blocks and locate every curb inlet. 2. Sweep the stencil area clean and dry at each inlet. 3. Apply the bilingual no-dumping stencil with fast-dry paint and a drip guard. 4. Log each stenciled inlet location as you go. 5. Photograph each finished stencil and record the count with GPS and date. Done when: Photo per stenciled inlet plus location log with GPS/date

Where
Curb inlets, central Wasco residential grid, Wasco, CA 93280
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo per stenciled inlet plus location log with GPS/date

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-01

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.