intermediate work · Owner-invited home sites, Paradise, CA 95969

Fit ember-resistant metal screens on the vents of an invited Paradise home

Embers enter homes through attic and foundation vents — it's how most of Paradise burned. Retrofitting each accessible vent with 1/8-inch corrosion-resistant metal mesh is a screwdriver-level job with survival-level payoff. Standard: CAL FIRE / IBHS home-hardening vent guidance (1/8" metal mesh, WUI standards). SDG 11. Proof: before/after per vent + mesh-spec log Method (CAL FIRE / IBHS home-hardening vent guidance (1/8" metal mesh, WUI standards). SDG 11.): 1. With the owner, inventory every vent reachable from the ground or a step below 6 ft; photograph each before. 2. Cut 1/8-inch metal mesh to size with margin; secure over each vent with screws/washers without blocking airflow. 3. Verify each screen is tight, flush, and un-paintable-gap free. 4. Photograph each finished vent and log the count and mesh spec. Done when: before/after per vent + mesh-spec log

Where
Owner-invited home sites, Paradise, CA 95969
Pay
$280 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after per vent + mesh-spec log

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-02

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: NFPA 1144 / Firewise USA structure-ignition-zone defensible-space assessment — documentation-only from a safe public/yard vantage

Bring

Steps

  1. 1. Document only — photograph Zone 0 (0-5 ft from the structure), Zone 1 (5-30 ft) and Zone 2 (30-100 ft) from the driveway or yard edge; never enter dense brush or approach a structurally questionable outbuilding.
  2. 2. Note vegetation type, spacing and ladder-fuel presence (brush touching tree canopy) in each zone from the safe vantage.
  3. 3. Photograph the roof material, gutters, vents, and any firewood or combustible material stacked against the structure.
  4. 4. Compile the zone-by-zone findings into a defensible-space checklist naming what a licensed/credentialed vegetation-management crew should clear first; never clear, cut, or move anything during this survey.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.