intermediate work · Host-invited community building near Fresno St, Avenal, CA 93204
Install a cold-water bottle refill station at an invited Avenal site
Cold drinking water in public Avenal is nearly nonexistent, so people carry sugary drinks or go without through brutal heat. A bottle-refill station installed at a host site — school, park building, or community hall — gives everyone a free, cold, trusted source. One fixture changes daily habits for a whole neighborhood. Standard: EPA WaterSense + school/community hydration-station practice; SDG 6 Clean Water, SDG 3 Good Health. Proof: Photos of mounted, running, leak-free station with GPS/date Method (EPA WaterSense + school/community hydration-station practice; SDG 6 Clean Water, SDG 3 Good Health.): 1. Confirm the host location with an existing code-compliant water line and drain nearby. 2. Mount the refill unit per the manufacturer's template at accessible height. 3. Connect to the existing supply with the specified fittings and install the filter cartridge. 4. Flush the line, check for leaks, and verify chilled flow. 5. Photograph the installed running station and record it with GPS and date. Done when: Photos of mounted, running, leak-free station with GPS/date
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: EPA WaterSense fixture flow-rate + leak audit
Bring
- flow-rate measurement bag + timer
- toilet dye tablets
- moisture meter
- GPS / address
- camera
- tablet / data sheet
Steps
- 1. Confirm the address; get a staff escort; photograph each fixture group.
- 2. Measure flow rate at each faucet/shower with the bag-and-timer method; record gallons per minute (gpm).
- 3. Test each toilet for leaks with a dye tablet (wait 10 min, check for color in the bowl); record flush volume.
- 4. Inspect fixtures, meters, and irrigation for visible leaks/drips; note each.
- 5. Read the water meter with all fixtures off; note any movement (indicates a hidden leak).
- 6. Rank WaterSense fixture upgrades + leak repairs by estimated water/cost savings.
- 7. Record flow rates, leak results, meter check, ranked measures, and photos into the proof record; sign.
If it does not match the plan
- Meter moving with all fixtures off AND active water damage (wet drywall, ceiling stain, pooling near electrical) -> STOP: possible electrical exposure; keep clear, route to a licensed plumber (and electrician if water contacts wiring). The agent documents, never opens walls.
- Suspected cross-connection / backflow risk (hose-bib, irrigation, boiler makeup) -> flag for a licensed plumber backflow test; potable-water contamination is a health hazard — do not test-operate the connection.
- Toilet dye migrates into the bowl -> flag a leaking flapper/valve for repair.
- Meter moves with all fixtures off -> flag a hidden leak for investigation.
- Faucet > 2.2 gpm or showerhead > 2.0 gpm -> recommend a WaterSense upgrade.
- No electrical/gas work; documentation only — flag suspected pipe damage, do not disassemble.
What counts as done
- Flow rate (gpm) recorded per fixture
- Toilet leak result + flush volume recorded per toilet
- Meter-with-all-off check recorded
- Ranked upgrade/repair measures + photos + address confirm
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.