Anyone can start here · Curb inlets, central Orange Cove, CA 93646

Stencil Orange Cove's storm drains so only rain goes down

Orange Cove's street drains run toward the same channels that water the citrus economy, and dumped oil or paint in a curb inlet rides straight out with the next storm. Most dumping is ignorance, not malice. A bilingual stencil on every inlet is the cheapest correction available. Standard: EPA NPDES stormwater public-education practice; SDG 6 Clean Water. Proof: Photo per stencil plus inlet log with GPS/date Method (EPA NPDES stormwater public-education practice; SDG 6 Clean Water.): 1. Locate every curb inlet on the assigned blocks. 2. Sweep and dry each stencil area. 3. Apply the bilingual no-dumping stencil with fast-dry paint. 4. Log each stenciled inlet. 5. Photograph each finished stencil and record the count with GPS and date. Done when: Photo per stencil plus inlet log with GPS/date

Where
Curb inlets, central Orange Cove, CA 93646
Pay
$152 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo per stencil plus inlet log with GPS/date

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-02

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.