Anyone can start here · Public perimeter path, former mining yard, Bytom, Poland

Document a former mining yard's surface condition from the public path in Bytom

A century of shallow coal, zinc, and lead mining under Bytom has left the city sinking — an average of several meters over the last hundred years — with subsidence basins, cracked pavement, and old industrial yards that need a documented public-vantage record before anyone plans safe reuse. Standard: Główny Instytut Górnictwa (Polish Central Mining Institute) post-mining land monitoring guidance + SDG 15. Proof: Photos from the public perimeter plus written condition note Method (Główny Instytut Górnictwa (Polish Central Mining Institute) post-mining land monitoring guidance + SDG 15.): 1. Walk only the public path or accessible perimeter of the site. 2. Photograph visible surface conditions — cracking, subsidence, discoloration, standing water — from a safe distance. 3. Note any fencing, warning signage, or active repair work. 4. Do not touch, enter, or collect any soil or material. 5. Log the findings with GPS pin and date for the municipal program to review. Done when: Photos from the public perimeter plus written condition note

Where
Public perimeter path, former mining yard, Bytom, Poland
Pay
$160 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photos from the public perimeter plus written condition note

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-02

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: EPA soil screening (composite surface sample, XRF/field kit)

Bring

Steps

  1. 1. Navigate to the parcel; record GPS; sketch a >=5-point sampling grid.
  2. 2. Photograph each sampling point and any visible staining/fill/slag.
  3. 3. Collect 0-15 cm cores from >=5 points; combine and mix in the clean bucket; subsample.
  4. 4. Run XRF/test kit on the composite; record each metal in ppm.
  5. 5. If petroleum is in scope, log PID readings and any odor/staining.
  6. 6. Bag/label any lab subsample; complete chain-of-custody.
  7. 7. Enter all analytes with units, depth, GPS, photos, and site sketch into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.