Anyone can start here · Approved curb inlets, Linda, CA 95901

Fit trash-catching filter inserts in Olivehurst and Linda's worst storm inlets

When the rain finally comes to Olivehurst and Linda it comes hard, and every inlet clogged with leaves and trash backs water into streets that cannot afford it. Curb-inlet filter inserts catch debris before the pipe and empty by hand between storms. Fitted at the survey's worst inlets, they buy drainage capacity exactly where the neighborhood needs it. Standard: EPA NPDES trash-capture practice for curb inlets; SDG 6 Clean Water, SDG 11 Sustainable Cities. Proof: Per-inlet insert and grate photos plus log with GPS/date Method (EPA NPDES trash-capture practice for curb inlets; SDG 6 Clean Water, SDG 11 Sustainable Cities.): 1. Confirm the approved inlet list with the sponsoring program. 2. Lift each grate with a partner using grate hooks and seat the sized insert. 3. Reseat grates flush with no trip hazard. 4. Log each fitted inlet. 5. Photograph each insert and reseated grate and record with GPS and date. Done when: Per-inlet insert and grate photos plus log with GPS/date

Where
Approved curb inlets, Linda, CA 95901
Pay
$220 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Per-inlet insert and grate photos plus log with GPS/date

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-02

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.