Anyone can start here · Host gathering site near Archibald St & 5th Ave, San Luis, AZ 85349
Build a handwash station for a San Luis gathering site
Vendors, field crews staging before dawn, and families at gathering spots in San Luis often have no place to wash hands — a basic health gap in a food-handling border city. A simple foot-pump or gravity handwash station at a host site closes it for a few dollars of parts. Standard: WHO/CDC WASH hand hygiene station guidance; SDG 6. Proof: Working-station photo + soap + signage Method (WHO/CDC WASH hand hygiene station guidance; SDG 6.): 1. Agree placement with the host site near the gathering or vending area. 2. Assemble a gravity or foot-pump handwash unit with a clean water reservoir, soap holder, and catch bucket. 3. Mount it stable at comfortable height and fill with clean water. 4. Post a simple wash-your-hands sign in Spanish and English. 5. Photograph the working station and record setup with date and GPS. Done when: Working-station photo + soap + signage
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: EPA WaterSense fixture flow-rate + leak audit
Bring
- flow-rate measurement bag + timer
- toilet dye tablets
- moisture meter
- GPS / address
- camera
- tablet / data sheet
Steps
- 1. Confirm the address; get a staff escort; photograph each fixture group.
- 2. Measure flow rate at each faucet/shower with the bag-and-timer method; record gallons per minute (gpm).
- 3. Test each toilet for leaks with a dye tablet (wait 10 min, check for color in the bowl); record flush volume.
- 4. Inspect fixtures, meters, and irrigation for visible leaks/drips; note each.
- 5. Read the water meter with all fixtures off; note any movement (indicates a hidden leak).
- 6. Rank WaterSense fixture upgrades + leak repairs by estimated water/cost savings.
- 7. Record flow rates, leak results, meter check, ranked measures, and photos into the proof record; sign.
If it does not match the plan
- Meter moving with all fixtures off AND active water damage (wet drywall, ceiling stain, pooling near electrical) -> STOP: possible electrical exposure; keep clear, route to a licensed plumber (and electrician if water contacts wiring). The agent documents, never opens walls.
- Suspected cross-connection / backflow risk (hose-bib, irrigation, boiler makeup) -> flag for a licensed plumber backflow test; potable-water contamination is a health hazard — do not test-operate the connection.
- Toilet dye migrates into the bowl -> flag a leaking flapper/valve for repair.
- Meter moves with all fixtures off -> flag a hidden leak for investigation.
- Faucet > 2.2 gpm or showerhead > 2.0 gpm -> recommend a WaterSense upgrade.
- No electrical/gas work; documentation only — flag suspected pipe damage, do not disassemble.
What counts as done
- Flow rate (gpm) recorded per fixture
- Toilet leak result + flush volume recorded per toilet
- Meter-with-all-off check recorded
- Ranked upgrade/repair measures + photos + address confirm
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.