intermediate work · Invited home, Vado colonia, Vado, NM 88072
Build a wheelchair ramp for an invited Vado colonia elder
Colonia elders in wheelchairs can be trapped in their own homes by three concrete steps — county services have long waits and contractors don't come out for small jobs at colonia prices. A modular ramp built to slope standards at an invited home returns someone's front door to them in a weekend. Standard: ADA residential ramp slope practice (1:12); SDG 10 Reduced Inequalities. Proof: Finished-ramp photos + slope and rail check Method (ADA residential ramp slope practice (1:12); SDG 10 Reduced Inequalities.): 1. Measure the door threshold height and plan the ramp run at 1:12 slope with the household. 2. Build or assemble modular ramp sections with treated lumber or an aluminum kit on solid footings. 3. Install continuous handrails at standard height and a level landing at the door. 4. Fasten a non-slip surface and check every joint solid. 5. Photograph the finished ramp in use with date and GPS. Done when: Finished-ramp photos + slope and rail check
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 75–150 minutes. Method of record: Aging-in-place retrofit survey (NAHB CAPS practice + CDC STEADI home fall-hazard checklist + ICC/ANSI A117.1 dimensional references; LBC Equity petal; observation/planning only)
Bring
- camera
- tape measure (doorway/hall widths, threshold heights, counter/bed/toilet heights, stair rise)
- lux meter or light-meter app (task + path lighting)
- tablet/clipboard with the STEADI-based room-by-room checklist
- notepad for the occupant's own routine map (their words)
Steps
- 1. Walk the occupant's actual day with them: wake, bathroom, kitchen, mail, laundry, favorite chair, bed. Record where they hesitate, grab, or avoid — the retrofit plan serves this routine, not a generic checklist. Their claim is simple: to stay in this home, safely.
- 2. Run the fall-hazard walkthrough (CDC STEADI home checklist): loose rugs and cords, stair condition + handrails both sides, tub/shower entry, toilet height, night path from bed to bathroom; photograph each hazard.
- 3. Measure the home against ICC/ANSI A117.1 references: doorway and hall clear widths, threshold heights, one-zero-step entry feasibility, bathroom clearances and reinforcement-ready walls for grab bars, kitchen reach zones; measure the light level on night paths and task areas.
- 4. Assess first-floor-living feasibility honestly: could a bedroom + full bath + laundry work on the entry level, and what would each move require (and which require a licensed contractor or structural review)?
- 5. Build the prioritized retrofit plan: immediate zero-construction wins (rug/cord/lighting/night-light changes), quick installs (grab bars into solid blocking, handrails, lever handles, threshold ramps), and contractor-scale items (bath reconfiguration, ramp with proper slope ~1:12, door widening) — each cost-banded, with funding paths (OAA/USDA-504/state) the household may qualify for.
- 6. Review the plan with the occupant and any family/caregiver they choose; enter photos, GPS/address, measurements, the routine map, and the ranked plan; sign. Real (their day, measured), Proven (photo+GPS+signature), One-of-one (this person, this home). Route care/equipment questions to their clinician/OT and structural/electrical work to licensed contractors.
If it does not match the plan
- Any structural change (ramp, door widening, bath reconfiguration, stair modification) -> plan-and-route only; a licensed contractor scopes and performs it — the survey never installs.
- Occupant reports recent falls, dizziness, or declining mobility -> advise routing to their clinician / an occupational therapist for a care-level assessment; the survey plans the home, never the person's health.
- Grab-bar locations without solid blocking/reinforcement visible -> mark as install-into-blocking-only by a qualified installer; a grab bar into drywall is a hazard, not a fix.
- Electrical work beyond plug-in lighting (switch relocation, added circuits, stair lighting) -> licensed electrician only.
- Evidence the occupant may be unsafe at home tonight (no rail on a used stair, non-functional bathroom) -> flag URGENT to the household/caregiver the same day, with the interim zero-construction mitigation named.
What counts as done
- Occupant's daily-routine map recorded in their own words with hesitation/avoidance points marked
- STEADI-based fall-hazard walkthrough completed with photo evidence per hazard
- Accessibility measurements recorded against ICC/ANSI A117.1 references (widths, thresholds, clearances, heights, night-path light levels)
- Prioritized retrofit plan delivered in three tiers (zero-construction / quick-install / contractor-scale), cost-banded, with funding paths and licensed-pro routing on structural/electrical items
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.