intermediate work · Owner-permitted lot near Zuni Rd & Louisiana Blvd SE, Albuquerque, NM 87108

Turn a surveyed International District lot corner into raised growing beds

With an owner's permission secured, a surveyed lot's best corner can become raised beds in a weekend — imported clean soil above the questionable ground, drip from a neighbor host's spigot, food where dumping used to be. In the International District, a working bed is the strongest anti-dumping signal there is. Standard: City of Albuquerque community garden practice; SDG 11 and SDG 2. Proof: Before/after corner photos + beds and drip Method (City of Albuquerque community garden practice; SDG 11 and SDG 2.): 1. Confirm the owner's written permission and the water arrangement with a neighboring host. 2. Build raised beds with lined bottoms on the cleared corner. 3. Fill with imported soil-compost mix — beds only, no digging into lot ground. 4. Run a drip line from the host spigot with a timer and plant the first season. 5. Photograph the finished corner and record beds and plantings with date and GPS. Done when: Before/after corner photos + beds and drip

Where
Owner-permitted lot near Zuni Rd & Louisiana Blvd SE, Albuquerque, NM 87108
Pay
$340 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Before/after corner photos + beds and drip

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 60–180 minutes. Method of record: Vacant/blighted residential-parcel stewardship — condition survey, native low-mow meadow seeding, and community raised-bed conversion. USDA/SARE sustainable land-conversion practice + Xerces Society no-till native-seeding guidance; proceeds only with the parcel owner (private owner, or the city/county land bank) having invited or authorized the work at claim time.

Bring

Steps

  1. 1. Confirm parcel ownership/authorization status (city/county land bank listing or private-owner invitation) and photograph the lot as found, noting dumped debris, standing water, and existing vegetation.
  2. 2. Clear loose trash and dumped debris to a safe hauling point; document anything too large or hazardous for hand removal rather than forcing it.
  3. 3. For the meadow variant: lightly rake the surface for seed-to-soil contact (no deep tillage) and broadcast the native low-mow mix at the labeled rate. For the raised-bed variant: site and build the bed frame level, back-fill with the planned soil mix, and confirm drainage.
  4. 4. Water in the seeding or the finished bed, and mark the treated area's boundary (flags or a low border) so it reads as tended, not abandoned.
  5. 5. Photograph the finished area from the same vantage as the before photo and log the treated square footage.
  6. 6. Enter the ownership/authorization reference, before/after photos, and the treatment log into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.