intermediate work · Host site pavement near Charleston Blvd & Nellis Blvd, Las Vegas, NV 89104

Coat a host site's blacktop with cool reflective sealant in East Las Vegas

East Las Vegas asphalt hits temperatures that burn skin on contact and holds furnace heat past midnight. Reflective cool-pavement coating on a host site's parking and play areas measurably drops surface temperature where people actually walk and kids actually play. Standard: Cool pavement program practice (Phoenix/LA pilots); SDG 11. Proof: Before/after photos + temperature comparison Method (Cool pavement program practice (Phoenix/LA pilots); SDG 11.): 1. Sweep and wash the host area clean and mask edges. 2. Apply reflective coating in thin even coats per product instructions. 3. Cure and re-stripe as needed. 4. Take surface temperature readings of coated versus uncoated pavement. 5. Photograph before and after with readings, date, and GPS. Done when: Before/after photos + temperature comparison

Where
Host site pavement near Charleston Blvd & Nellis Blvd, Las Vegas, NV 89104
Pay
$380 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Before/after photos + temperature comparison

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 90–240 minutes. Method of record: Urban heat-island mitigation for civic hard surfaces and pedestrian waiting areas — high-solar-reflectance (cool) coatings on sidewalks/schoolyards/plazas and shade-sail/structure installs at bus stops and gathering points. EPA Heat Island Reduction Program cool-pavement guidance + ASTM E1918 solar-reflectance testing; municipal right-of-way permit where the surface or structure sits in the public way.

Bring

Steps

  1. 1. Photograph the target surface or waiting area as found, including a mid-day surface-temperature reading, and confirm the right-of-way permit and any utility locates before ground disturbance.
  2. 2. Set cones/barricades for a pedestrian-safe work zone; pressure-wash and clear the surface of debris, or confirm the shade-structure footing location clears underground utilities (811 locate) and meets the manufacturer's anchor spec.
  3. 3. Apply the cool-pavement coating system per manufacturer instructions in the specified number of coats and cure time, OR set and anchor the shade structure/sail per its engineering spec, keeping clearances for accessible passage.
  4. 4. Verify: for coatings, confirm even coverage with no missed sections and let the full cure window pass before reopening to traffic; for structures, confirm anchor torque and structural stability by hand-test.
  5. 5. Take a matching-vantage after photo and a same-conditions surface-temperature reading; log the reading delta.
  6. 6. Enter before/after photos, the temperature readings, materials/product used, and the permit reference into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.