intermediate work · Approved bank sections, Three Mile Creek, Mobile, AL 36610
Plant a native buffer along a cleared Three Mile Creek bank section
A cleaned bank stays clean and stable when native vegetation holds it: switchgrass, buttonbush, and river birch filter runoff, shade the water, and give the creek corridor back some of its life. Planting the buffer on sections already cleared of litter is the doing rung above the monthly cleanup. It builds the green spine Africatown's plans call for. Standard: NRCS riparian buffer practice (CP-22 pattern); SDG 6.6 and 15.1. Proof: Planted-section photos with species log Method (NRCS riparian buffer practice (CP-22 pattern); SDG 6.6 and 15.1.): 1. Confirm the planting section with the site host or city contact and call 811 before digging. 2. Set out native plugs and shrubs on the marked spacing above the waterline. 3. Plant each with hand tools, firm in, and water from carried containers. 4. Mulch lightly and flag the rows for the watering rounds. 5. Photograph the planted section and log species and counts with GPS and date. Done when: Planted-section photos with species log
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 30–60 minutes. Method of record: EPA dry-weather / AMD field screening
Bring
- GPS phone
- pH meter or strips
- conductivity meter
- ammonia + iron test kit as specified
- surfactant screen if specified
- gloves
- camera
Steps
- 1. Navigate to the outfall/reach; record GPS; photograph it, capturing any visible flow or staining.
- 2. Note whether flow is present in dry weather (yes/no).
- 3. Measure and record pH, conductivity, and each specified analyte per kit instructions.
- 4. Log any color, odor, floc, or aquatic-life observation.
- 5. Enter all readings with units, GPS, time, and photos into the proof record; sign.
If it does not match the plan
- Dry-weather flow present with elevated conductivity/ammonia/surfactants -> flag suspected illicit discharge for the responsible agency.
- pH < 6 with visible iron floc -> tag suspected acid mine drainage; recommend metals lab panel.
What counts as done
- pH + conductivity recorded with units
- Each specified analyte recorded with a value
- Dry-weather flow present? recorded yes/no
- GPS waypoint + timestamped photo
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.