intermediate work · Host-approved pickup corner near Bacom Point Rd, Pahokee, FL 33476

Build a shade shelter at a Glades farmworker pickup corner

Before dawn and after shift, farmworkers wait at known pickup corners in Pahokee and Belle Glade with no shade against some of the most brutal heat-index readings in Florida. A host-approved shade shelter at a main pickup corner is direct heat protection for the people who feed the country. Florida's heat seasons are lengthening; the bare corner is not. Standard: OSHA-NIOSH heat illness prevention (shade access); SDG 8.8 and 3. Proof: Finished-shelter photos from all sides Method (OSHA-NIOSH heat illness prevention (shade access); SDG 8.8 and 3.): 1. Confirm the corner and placement with the landowner or city contact, and call 811 before setting posts. 2. Assemble the shade structure or set posts with a shade-cloth roof per the kit's wind rating. 3. Anchor for hurricane-zone wind per the kit specification. 4. Add bench seating if included and level the ground surface. 5. Photograph the finished shelter from all sides with GPS and date. Done when: Finished-shelter photos from all sides

Where
Host-approved pickup corner near Bacom Point Rd, Pahokee, FL 33476
Pay
$380 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Finished-shelter photos from all sides

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: OSHA Heat-Related Hazards NEP (2022) + NIOSH Criteria heat-illness-prevention program audit (water/rest/shade, acclimatization, heat-index triggers)

Bring

Steps

  1. 1. Check in with the competent person; confirm a written heat-illness prevention plan exists and identify who is new or returning (acclimatization risk). Observe-and-document only.
  2. 2. Record the day's heat index (temperature + humidity) and note which OSHA trigger tier applies (caution ~80°F / high ~91°F / extreme).
  3. 3. Check water: cool, potable, accessible, and enough for ~1 quart per worker per hour; photograph the stations and note their distance from the work.
  4. 4. Check shade + rest: a shaded rest area is available and the rest schedule scales with the heat-index tier (more/longer breaks as it climbs).
  5. 5. Check acclimatization: is there a graded schedule for new workers (first week) and returning workers (after a week or more away) — the highest-risk group?
  6. 6. Check recognition + emergency: are supervisors/workers trained to spot heat illness, is there a buddy/monitoring system, and a written emergency response (call 911, cool, don't leave alone)?
  7. 7. Tier each finding against the heat-index tier (stop-work / correct-before-proceed / monitor); enter photos, GPS, heat index, checklist, plan status, and findings; sign. Route stop-work items to the competent person.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.