Anyone can start here · Residential blocks near Carson St and Avalon Blvd, Carson, CA 90745

Stencil the storm drains that feed the Dominguez Channel on Carson's residential blocks

Carson's street drains run to the Dominguez Channel, the urban waterway that carries the watershed's trash and runoff to the harbor. Marked inlets measurably reduce dumping of washwater, oil, and litter, and most Carson blocks have never been stenciled. Standard: LA County MS4 storm-drain marking practice; SDG 6 (Clean Water and Sanitation). Proof: Per-inlet marker photos plus block map Method (LA County MS4 storm-drain marking practice; SDG 6 (Clean Water and Sanitation).): 1. Map every inlet on the assigned blocks on a simple sheet. 2. Sweep and dry the curb face at each inlet. 3. Apply the drains-to-channel stencil or adhesive marker per kit instructions. 4. Let each marker set cleanly. 5. Photograph each marker close-up plus street context with date and GPS. Done when: Per-inlet marker photos plus block map

Where
Residential blocks near Carson St and Avalon Blvd, Carson, CA 90745
Pay
$160 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Per-inlet marker photos plus block map

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.