Anyone can start here · Occupant-invited homes near Temple Ave, La Puente, CA 91746
Install a rain barrel at an invited La Puente home to catch the winter roof water
La Puente gardens run on metered drinking water while winter storms send roof runoff straight down driveways to the storm drains. A barrel on one downspout at an invited home banks that water for the dry months and keeps first-flush grime out of the creek system. Standard: LA County rain barrel and downspout disconnect practice; SDG 6 (Clean Water and Sanitation). Proof: Installed-barrel photos with overflow shown Method (LA County rain barrel and downspout disconnect practice; SDG 6 (Clean Water and Sanitation).): 1. Choose the downspout with the occupant and set a level paver base. 2. Cut the downspout and fit the diverter or elbow to the barrel inlet. 3. Seat the barrel, connect the overflow aimed away from the foundation, and screen the inlet. 4. Test flow with a hose and check the overflow path. 5. Photograph the finished setup from two angles with date and GPS. Done when: Installed-barrel photos with overflow shown
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)
Bring
- measuring tape
- GPS phone
- camera
- trowel / probe
- data sheet
- gloves
Steps
- 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
- 2. Photograph the asset, its inlet, and its outlet/overflow.
- 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
- 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
- 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
- 6. Note erosion, bypass, or structural damage and list the maintenance needed.
- 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.
If it does not match the plan
- Standing water persists > 48h after rain -> flag failed infiltration (clogged media) for rehab.
- Inlet or outlet blocked -> flag for cleaning; the asset isn't capturing runoff.
- Erosion, undercutting, or flow bypassing the asset -> flag for repair.
- Documentation only — no digging out media or altering structures.
What counts as done
- Asset type + overall condition recorded
- Inlet + outlet clear/blocked status recorded
- Standing-water / infiltration observation recorded
- Sediment/trash level + maintenance recommendations + GPS + photos
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.