Anyone can start here · Residential blocks near Bassett St and Canoga Ave, Canoga Park, CA 91303

Stencil the storm drains on Canoga Park blocks at the LA River's headwaters

Canoga Park sits where the Los Angeles River officially begins, and every unmarked drain on its blocks feeds the river's very first miles with litter and washwater. Stenciled inlets here protect the whole river downstream โ€” there is no more upstream place to do this work. Standard: City of LA storm-drain marking practice; SDG 6 (Clean Water and Sanitation). Proof: Per-inlet marker photos plus block map Method (City of LA storm-drain marking practice; SDG 6 (Clean Water and Sanitation).): 1. Map each inlet on the assigned blocks. 2. Sweep and dry each curb face. 3. Apply the drains-to-river stencil or adhesive marker per kit instructions. 4. Confirm each marker is clean and legible. 5. Photograph each marker close-up and in context with date and GPS. Done when: Per-inlet marker photos plus block map

Where
Residential blocks near Bassett St and Canoga Ave, Canoga Park, CA 91303
Pay
$160 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Per-inlet marker photos plus block map

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30โ€“75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.