Anyone can start here · Curb gutters on residential blocks near Lemon Street and Amador Street, Vallejo, CA 94590

Clear leaf litter and trash from the curb gutters that feed Lake Dalwigk before the rain (2026-07-19)

South Vallejo's low blocks flood first in winter storms because leaves and trash dam the curb gutters before water ever reaches an inlet. City sweepers miss parked-up blocks. A monthly rake-and-bag round on the worst gutters keeps water moving and porches dry. Standard: Municipal MS4 inlet and gutter maintenance practice; SDG 11 (Sustainable Cities and Communities). Proof: Before/after gutter photos per block Method (Municipal MS4 inlet and gutter maintenance practice; SDG 11 (Sustainable Cities and Communities).): 1. Walk the assigned blocks and identify gutters packed with leaves, silt, or trash. 2. Rake and shovel debris from the gutter line into bags, keeping all material out of the inlet. 3. Leave each inlet grate visible and unblocked without opening it. 4. Stage bags for green-waste or trash pickup per city rules. 5. Photograph each gutter before and after with the block sign in frame. Done when: Before/after gutter photos per block

Where
Curb gutters on residential blocks near Lemon Street and Amador Street, Vallejo, CA 94590
Pay
$152 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Before/after gutter photos per block

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-08-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.