Anyone can start here · Curb gutters on low blocks near Sacramento Street, Suisun City, CA 94585

Keep the lowest streets in Suisun City draining by clearing curb gutters monthly (2026-07-19)

Suisun City's oldest streets sit barely above the slough, and a blocked gutter here means water in yards within an hour of hard rain. Leaves, silt, and trash pile against the curbs faster than sweeping cycles catch them. A monthly clear on the lowest blocks buys the whole drainage system time. Standard: Municipal MS4 gutter and inlet maintenance practice; SDG 11 (Sustainable Cities and Communities). Proof: Before/after gutter photos per block Method (Municipal MS4 gutter and inlet maintenance practice; SDG 11 (Sustainable Cities and Communities).): 1. Walk the lowest assigned blocks near the waterfront and flag packed gutter runs. 2. Rake and bag debris from the gutter line, keeping everything out of the inlets. 3. Leave each inlet grate visible and unblocked without opening it. 4. Stage bags per city collection rules and log the blocks cleared. 5. Photograph each stretch before and after with street signs in frame. Done when: Before/after gutter photos per block

Where
Curb gutters on low blocks near Sacramento Street, Suisun City, CA 94585
Pay
$152 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Before/after gutter photos per block

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-08-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.