Anyone can start here · Residential curbs near Charter Street and Spring Street, Redwood City, CA 94063

Mark the storm drains of eastern Redwood City so neighbors know they drain to the creek and bay

The flat blocks east of El Camino drain through Redwood Creek's channel to the bay marshes, untreated. Car-work runoff and dumped paint at these inlets reaches salt marsh within hours. Fresh curb markers on the unmarked inlets are proven, cheap source control for the neighborhood's own creek. Standard: San Mateo County stormwater program inlet-marking practice; SDG 6 (Clean Water and Sanitation). Proof: Photo of each marked inlet plus location list Method (San Mateo County stormwater program inlet-marking practice; SDG 6 (Clean Water and Sanitation).): 1. Map ten unmarked inlets on the assigned blocks. 2. Sweep and dry each curb face. 3. Apply the 'Drains to Bay' marker beside each inlet. 4. Log cross-streets for each marker. 5. Photograph every finished marker with its inlet. Done when: Photo of each marked inlet plus location list

Where
Residential curbs near Charter Street and Spring Street, Redwood City, CA 94063
Pay
$160 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of each marked inlet plus location list

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.