intermediate work · Host-invited community garden near Line Street, Hollister, CA 95023

Convert a host-invited Hollister community garden to drip irrigation

San Benito County gardens water by hose and sprinkler out of one of the state's more stressed groundwater basins, losing half of it to evaporation in valley heat. Converting a host garden's beds to simple drip lines on a timer cuts its water use roughly in half and models the fix for every gardener who walks past. Standard: EPA WaterSense irrigation guidance; SGMA groundwater stewardship spirit; SDG 6 (Clean Water and Sanitation). Proof: Running-system photos plus emitter check Method (EPA WaterSense irrigation guidance; SGMA groundwater stewardship spirit; SDG 6 (Clean Water and Sanitation).): 1. Confirm the bed layout and water source with the garden host. 2. Run mainline tubing from the spigot through a filter and pressure regulator. 3. Lay drip lines along each bed at emitter spacing matched to the plantings. 4. Set the battery timer, flush the lines, and check every emitter under pressure. 5. Photograph the running system and walk the host through seasonal adjustments. Done when: Running-system photos plus emitter check

Where
Host-invited community garden near Line Street, Hollister, CA 95023
Pay
$300 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Running-system photos plus emitter check

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45โ€“90 minutes. Method of record: EPA WaterSense fixture flow-rate + leak audit

Bring

Steps

  1. 1. Confirm the address; get a staff escort; photograph each fixture group.
  2. 2. Measure flow rate at each faucet/shower with the bag-and-timer method; record gallons per minute (gpm).
  3. 3. Test each toilet for leaks with a dye tablet (wait 10 min, check for color in the bowl); record flush volume.
  4. 4. Inspect fixtures, meters, and irrigation for visible leaks/drips; note each.
  5. 5. Read the water meter with all fixtures off; note any movement (indicates a hidden leak).
  6. 6. Rank WaterSense fixture upgrades + leak repairs by estimated water/cost savings.
  7. 7. Record flow rates, leak results, meter check, ranked measures, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.