Anyone can start here · W 15th St, Anniston, AL

Document the creek buffer near the old industrial corridor in West Anniston, from the public sidewalk only (2026-07-20)

West Anniston carries a long, well documented public record of soil contamination tied to the old industrial corridor near Choccolocco Creek. Residents want a current, dated photo record of the buffer areas along the public right of way so the record stays fresh between the licensed environmental crew's own monitoring visits. Standard: EPA public record, West Anniston industrial site buffer documentation Proof: Dated photo set with GPS tags matched to the written log Method (EPA public record, West Anniston industrial site buffer documentation): 1. Walk the public sidewalk or street shoulder only, never onto private or fenced industrial land 2. Photograph the buffer strip and any visible bare soil or erosion from the public vantage point 3. Log GPS coordinates for each photo location 4. Note any obvious change since the last documentation round in a written log 5. Submit the photo set and log; a licensed environmental crew performs any physical soil work Done when: Dated photo set with GPS tags matched to the written log

Where
W 15th St, Anniston, AL
Pay
$180 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Dated photo set with GPS tags matched to the written log

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-08-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: EPA soil screening (composite surface sample, XRF/field kit)

Bring

Steps

  1. 1. Navigate to the parcel; record GPS; sketch a >=5-point sampling grid.
  2. 2. Photograph each sampling point and any visible staining/fill/slag.
  3. 3. Collect 0-15 cm cores from >=5 points; combine and mix in the clean bucket; subsample.
  4. 4. Run XRF/test kit on the composite; record each metal in ppm.
  5. 5. If petroleum is in scope, log PID readings and any odor/staining.
  6. 6. Bag/label any lab subsample; complete chain-of-custody.
  7. 7. Enter all analytes with units, depth, GPS, photos, and site sketch into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.