Anyone can start here · Public storm drain inlets near Sunnymead Blvd & Graham St, Moreno Valley, CA 92553

Stencil the unmarked storm drains of the Sunnymead blocks in Moreno Valley

Moreno Valley's storm drains run toward the San Jacinto watershed and Lake Perris, and its older Sunnymead blocks have inlets with no markings at all. Oil changes and paint rinse still go down them. A painted no-dumping stencil at each inlet is cheap, proven, and lasts years. Standard: EPA NPDES MS4 outreach best practice; Santa Ana Regional Water Board — SDG 6. Proof: Photos of each stenciled drain plus a count Method (EPA NPDES MS4 outreach best practice; Santa Ana Regional Water Board — SDG 6.): 1. Map unmarked or faded inlets on the assigned blocks. 2. Sweep each curb face clean. 3. Paint the no-dumping stencil beside each inlet. 4. Bag litter sitting on grates. 5. Photograph each stenciled drain with GPS and date and log the count. Done when: Photos of each stenciled drain plus a count

Where
Public storm drain inlets near Sunnymead Blvd & Graham St, Moreno Valley, CA 92553
Pay
$160 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photos of each stenciled drain plus a count

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.