intermediate work · Host-invited community garden near 4th St & Vine Ave, Coachella, CA 92236

Install timer-driven drip irrigation on the beds of an invited Coachella community garden

Community garden beds in Coachella die in the weeks between volunteer visits — hose watering can't keep pace with desert evaporation. A filtered, timer-driven drip system on the existing beds cuts water use sharply and lets the garden survive the summer that matters most to the families eating from it. Standard: EPA WaterSense irrigation practice; UC ANR desert drip guidance — SDG 6, SDG 2. Proof: Photos of the installed, running drip system and timer Method (EPA WaterSense irrigation practice; UC ANR desert drip guidance — SDG 6, SDG 2.): 1. Map the beds and spigot with the host and plan the runs. 2. Install a backflow preventer, filter, and battery timer at the spigot. 3. Run mainline and drip emitters to every bed. 4. Set the desert watering schedule with the host and test all emitters. 5. Photograph the running system and timer with GPS and date. Done when: Photos of the installed, running drip system and timer

Where
Host-invited community garden near 4th St & Vine Ave, Coachella, CA 92236
Pay
$300 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photos of the installed, running drip system and timer

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: EPA WaterSense fixture flow-rate + leak audit

Bring

Steps

  1. 1. Confirm the address; get a staff escort; photograph each fixture group.
  2. 2. Measure flow rate at each faucet/shower with the bag-and-timer method; record gallons per minute (gpm).
  3. 3. Test each toilet for leaks with a dye tablet (wait 10 min, check for color in the bowl); record flush volume.
  4. 4. Inspect fixtures, meters, and irrigation for visible leaks/drips; note each.
  5. 5. Read the water meter with all fixtures off; note any movement (indicates a hidden leak).
  6. 6. Rank WaterSense fixture upgrades + leak repairs by estimated water/cost savings.
  7. 7. Record flow rates, leak results, meter check, ranked measures, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.