Anyone can start here · Street inlets near Katella Ave and Beach Blvd, Stanton, CA 90680

Mark Stanton's storm drains that feed the flood channels to the sea

Stanton's dense little grid drains through concrete channels that run to the San Gabriel River and the ocean, and its unmarked inlets swallow motor oil and trash accordingly. Bilingual curb markers on every unmarked inlet are cheap, fast, and proven to cut casual dumping. Standard: EPA MS4 stormwater public-education requirement — SDG 6. Proof: Per-inlet marker photos Method (EPA MS4 stormwater public-education requirement — SDG 6.): 1. Map unmarked inlets on assigned blocks from the sidewalk. 2. Clean each curb face and apply the approved bilingual marker. 3. Log each marked location. 4. Photograph each finished marker with GPS and date. Done when: Per-inlet marker photos

Where
Street inlets near Katella Ave and Beach Blvd, Stanton, CA 90680
Pay
$160 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Per-inlet marker photos

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.