intermediate work · Invited homes, west-side neighborhoods near the bay, Eureka, CA 95501

Add a battery backup to the sump pump in an invited low-lying Eureka home

Many older homes in Eureka's low neighborhoods near the bay rely on a single sump pump to keep crawlspaces dry through winter storms, and power outages arrive with the same storms that bring the water. A battery backup keeps the pump running through an outage so one bad night does not mean a soaked, moldy crawlspace. Standard: FEMA P-312 Homeowner's Guide to Retrofitting, pump and backup-power practice; SDG 11 Sustainable Cities and Communities. Proof: Before/after photos plus a recorded power-cut test Method (FEMA P-312 Homeowner's Guide to Retrofitting, pump and backup-power practice; SDG 11 Sustainable Cities and Communities.): 1. Confirm the invitation with the occupant and locate the existing sump pump and its outlet. 2. Photograph the pump pit and existing wiring before starting. 3. Install the battery backup unit per its instructions, connecting the backup pump or power module beside the main pump. 4. Test by unplugging main power and confirming the backup runs and moves water. 5. Show the occupant the alarm and the battery check routine. 6. Photograph the finished installation and the successful test to record proof. Done when: Before/after photos plus a recorded power-cut test

Where
Invited homes, west-side neighborhoods near the bay, Eureka, CA 95501
Pay
$380 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Before/after photos plus a recorded power-cut test

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: FEMA floodplain + green-infrastructure siting screen

Bring

Steps

  1. 1. Confirm post-event conditions are safe; navigate to the site; record GPS.
  2. 2. Photograph deposited sediment / affected area.
  3. 3. Measure deposition depth at representative points.
  4. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values.
  5. 5. Note debris, hazards, and the extent (sketch).
  6. 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.