intermediate work · Invited homes, north Willits blocks off Sherwood Road, Willits, CA 95490
Fit interior storm-window panels through an invited Willits home
Most Willits homes still carry single-pane windows against mountain winters, and full window replacement is out of reach for mill-town budgets. Interior storm panels — rigid film in a frame fitted to each window — deliver most of a double-pane's warmth for a tenth of the cost, and they go in with hand tools in a day. Standard: U.S. DOE interior storm window retrofit practice; SDG 7 Affordable and Clean Energy. Proof: Before/after photos of each fitted window Method (U.S. DOE interior storm window retrofit practice; SDG 7 Affordable and Clean Energy.): 1. Confirm the invitation and measure each single-pane window to be fitted. 2. Photograph the windows before work. 3. Cut and assemble each interior storm panel frame to size and fit the film taut. 4. Mount each panel with its compression or magnetic seal and check for gaps. 5. Show the occupant how to remove panels for summer. 6. Photograph each fitted window and log the count. Done when: Before/after photos of each fitted window
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 90–240 minutes. Method of record: Ohio Development Services Agency Home Weatherization Assistance Program (HWAP) — the state pass-through of the DOE Weatherization Assistance Program's cold-climate field protocol: blower-door-directed air sealing toward a CFM50 infiltration target, attic insulation to R-49 / wall cavity to R-13, and mandatory pre/post combustion-safety testing before any tightening closes out.
Bring
- calibrated blower-door fan + manometer
- combustion-safety analyzer (CO/ambient + spillage check)
- camera
- caulk gun + spray foam + weatherstripping
- insulation (blown-in or batt, rated to R-49 attic / R-13 wall)
- smoke pencil (leak-path tracing)
- tape measure + infrared thermometer
Steps
- 1. Walk the home with the occupant, note every combustion appliance present, and photograph each nameplate before any work begins.
- 2. Set up the calibrated blower door in the main entry and record the baseline CFM50 reading.
- 3. Trace and photograph the top infiltration paths with a smoke pencil (rim joist, attic hatch, penetrations, window/door perimeters).
- 4. Run the pre-tightening combustion-safety check (ambient CO reading, spillage test at draft hoods) with the blower door off; a failed check stops the job and routes to a licensed HVAC technician before any sealing.
- 5. Air-seal the ranked leak paths in order and bring attic insulation to R-49 / accessible wall cavity to R-13 per the HWAP job sheet, maintaining required soffit-to-ridge ventilation.
- 6. Re-run the blower-door test to confirm the new CFM50 result.
- 7. Run the mandatory post-tightening combustion-safety re-test; a failed re-test stops the job and routes to a licensed HVAC technician for venting correction before further sealing.
- 8. Photograph the finished insulation depth and the passed post-tightening combustion-safety check; enter before/after CFM50, materials used, and the combustion-safety result into the proof record; sign.
If it does not match the plan
- Pre-tightening combustion-safety check fails (elevated CO or spillage) -> STOP: do not tighten the home; route to a licensed HVAC technician before any sealing proceeds.
- Post-tightening combustion-safety re-test fails -> STOP: back off sealing and route to a licensed HVAC technician for venting correction before close-out.
- Home is pre-1978 with disturbed/peeling paint at a sealing surface -> STOP: do not scrape or sand; route to an EPA RRP lead-safe certified pro.
What counts as done
- Before and after CFM50 readings from the same calibrated blower-door setup
- Photos of each sealed leak path and the finished attic/wall insulation depth
- Post-tightening combustion-safety (CO/backdraft) check passed and logged
- Required soffit-to-ridge ventilation maintained after insulation work
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.