intermediate work · Invited fire-affected lots, southwest Redding off Placer Road, Redding, CA 96001

Stake straw wattles across the bare ground of an invited fire-affected Redding lot

Lots burned or scraped bare in Redding's fire-affected neighborhoods shed mud into streets and storm drains with every winter storm, and that sediment runs to the creeks and the Sacramento. Straw wattles staked along the contours of a flat, cleared lot hold the soil where it is until groundcover returns. Standard: NRCS post-fire erosion control practice (straw wattle installation); SDG 15 Life on Land. Proof: Before/after photos of the staked wattle lines Method (NRCS post-fire erosion control practice (straw wattle installation); SDG 15 Life on Land.): 1. Confirm the owner's invitation and photograph the bare areas shedding soil. 2. Lay wattles along the contour lines across the slope of the drainage path, ends overlapped. 3. Set each wattle in a shallow hand-scraped groove so it seats against the ground. 4. Drive wooden stakes through or downhill of each wattle every few feet until firm. 5. Photograph the completed lines and log the total length installed. Done when: Before/after photos of the staked wattle lines

Where
Invited fire-affected lots, southwest Redding off Placer Road, Redding, CA 96001
Pay
$280 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Before/after photos of the staked wattle lines

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: USFS BAER soil burn severity + water-repellency assessment

Bring

Steps

  1. 1. Confirm the burn area is open/safe to enter; navigate to a transect; record GPS.
  2. 2. Photograph the transect capturing ground cover and ash.
  3. 3. Classify soil burn severity (low/moderate/high) at 3 points.
  4. 4. Run the water-drop penetration test; record repellency (time for a drop to absorb).
  5. 5. Estimate remaining ground-cover percent and slope.
  6. 6. Enter severity class, repellency, ground cover, slope, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.