intermediate work · Invited homes, blocks off North Main Street, Yreka, CA 96097

Install heat tape on the freeze-prone pipes of an invited Yreka home

Yreka's hard freezes burst pipes every winter in the crawlspaces and wall-exposed runs of its old housing, and for elderly residents a burst line means water damage they cannot repair. Thermostatic heat tape plus foam sleeve on the freeze-prone runs, installed in one visit, ends the annual gamble. Standard: IBHS freeze-loss prevention practice (heat tape + insulation); SDG 11 Sustainable Cities and Communities. Proof: Before/after photos of each protected run Method (IBHS freeze-loss prevention practice (heat tape + insulation); SDG 11 Sustainable Cities and Communities.): 1. Confirm the invitation and locate the freeze-prone runs at crawl entries, exterior walls, and hose bibs. 2. Photograph each run before work. 3. Install thermostatic heat tape along each reachable run per its instructions, plugged to a grounded outlet, never overlapped on itself. 4. Fit foam sleeves over the taped runs and insulated covers on bibs. 5. Confirm the tape's indicator works and show the occupant. 6. Photograph the finished runs and log the total length. Done when: Before/after photos of each protected run

Where
Invited homes, blocks off North Main Street, Yreka, CA 96097
Pay
$260 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Before/after photos of each protected run

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 60–150 minutes. Method of record: Cold-climate building-envelope weatherization install (DOE WAP install practice + BPI combustion-safety-first sequencing; storm windows/doors, attic-bypass air-sealing, rim-joist insulation, pipe freeze-protection) -- hands-on install, not a survey; assess->prep->install->verify

Bring

Steps

  1. 1. Confirm the scope with the occupant/facility manager against the readiness survey's ranked target list (or a fresh walk if none exists); photograph the untreated bypass, window, rim-joist run or pipe run.
  2. 2. Prep the surface: clean and dry the substrate, remove failed old caulk or weatherstripping, and clear any debris blocking the install.
  3. 3. Install the sealing/insulation material to the target's spec -- storm window/door, spray-foam bypass seal, rim-joist rigid-foam batt, or heat-tape plus pipe-insulation sleeve -- per manufacturer instructions.
  4. 4. Verify the result (smoke-pencil/hand check for bypass work, fit-and-lock check for storm windows/doors, continuous-coverage check for rim-joist or pipe insulation) and photograph the finished install from the same vantage.
  5. 5. Note any combustion-safety or moisture flag surfaced during the install and route it to a BPI-qualified pro before continuing to the next target.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.