Anyone can start here · Invited home near Pajaro Blvd, Pajaro, CA 95076
Redirect roof runoff away from a Pajaro home's foundation
Many Pajaro homes still drain roof water straight down next to the foundation, which is exactly the moisture path that made the storm damage worse for some houses. Redirecting a downspout out onto a splash block and away from the foundation is simple, cheap, and cuts the chance of the same damage happening again. Standard: EPA green-stormwater-infrastructure downspout practice — SDG 11. Proof: Before/after photo of the redirected downspout Method (EPA green-stormwater-infrastructure downspout practice — SDG 11.): 1. Photograph the current downspout discharge point. 2. Attach a redirect extension or splash block to carry water at least 6 feet from the foundation. 3. Check the new discharge point does not send water onto a neighbor's property. 4. Confirm water flows freely through the extension. 5. Photograph the finished redirect with GPS and date. Done when: Before/after photo of the redirected downspout
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)
Bring
- measuring tape
- GPS phone
- camera
- trowel / probe
- data sheet
- gloves
Steps
- 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
- 2. Photograph the asset, its inlet, and its outlet/overflow.
- 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
- 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
- 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
- 6. Note erosion, bypass, or structural damage and list the maintenance needed.
- 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.
If it does not match the plan
- Standing water persists > 48h after rain -> flag failed infiltration (clogged media) for rehab.
- Inlet or outlet blocked -> flag for cleaning; the asset isn't capturing runoff.
- Erosion, undercutting, or flow bypassing the asset -> flag for repair.
- Documentation only — no digging out media or altering structures.
What counts as done
- Asset type + overall condition recorded
- Inlet + outlet clear/blocked status recorded
- Standing-water / infiltration observation recorded
- Sediment/trash level + maintenance recommendations + GPS + photos
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.