intermediate work · Invited home garden near Merritt St, Castroville, CA 95012
Retrofit the drip line at an audited Castroville home garden
Once an audit flags the clogged and leaking emitters in a home garden's drip system, replacing them with matched new emitters is the direct fix that gets every plant its share of water instead of one soaked spot and a dozen dry ones. It is the difference between a struggling garden and a productive one on the same water bill. Standard: EPA WaterSense/NRCS irrigation-efficiency retrofit practice โ SDG 6. Proof: Photo of even flow at each retrofitted emitter Method (EPA WaterSense/NRCS irrigation-efficiency retrofit practice โ SDG 6.): 1. Confirm the emitters flagged in the audit. 2. Remove the clogged or leaking emitter. 3. Install a matched replacement emitter at the correct spacing. 4. Run the system and check even flow at each point. 5. Photograph the retrofitted line with GPS and date. Done when: Photo of even flow at each retrofitted emitter
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 60โ120 minutes. Method of record: Mobile Irrigation Lab catch-can distribution-uniformity audit
Bring
- matched catch cans (or cups)
- measuring cylinder / ruler
- pressure gauge
- stopwatch
- GPS phone
- camera
- data sheet
Steps
- 1. Confirm the site/zone; record GPS; identify the system type (sprinkler / drip / micro).
- 2. Sprinkler zones: lay catch cans on a grid across the zone, run the zone a fixed time, and measure the water depth in each can.
- 3. Compute distribution uniformity (low-quarter DU) from the catch-can depths.
- 4. Drip/micro zones: measure emitter flow at several points (fill a container over a fixed time) and inspect for clogs and leaks.
- 5. Read operating pressure at the zone; note leaks, broken/misaligned heads, and overspray onto pavement.
- 6. Review the run schedule against plant/soil need (over/under-watering, runoff).
- 7. Rank fixes (head repair, pressure regulation, schedule change) by water savings; record DU/emitter flow, pressure, leaks, schedule note, photos; sign.
If it does not match the plan
- Low-quarter DU < 0.65 (sprinkler) -> flag poor uniformity for repair/redesign.
- Visible runoff or overspray onto pavement -> flag schedule/head correction.
- Emitter clogging or line leaks (drip) -> flag maintenance.
- Broken/misaligned head -> flag for repair. Documentation only; no repairs by surveyor.
What counts as done
- Distribution uniformity (or drip emitter-flow) recorded
- Operating pressure recorded
- Broken/leaking components + overspray noted
- Schedule-vs-need note + ranked fixes + GPS + photos
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.