Anyone can start here · Downtown Oroville storm drains near Montgomery St, Oroville, CA 95965

Stencil 'Drains to Feather River' markers on downtown Oroville storm drains (2026-07-20)

Downtown Oroville's storm drains empty straight into the Feather River with no treatment in between, and most people walking past never make that connection. A simple stenciled marker at each drain is a low-cost reminder that keeps chemical-free choices and litter out of the water. Standard: EPA storm drain marking program + SDG 6 clean water Proof: Photo of each finished stencil Method (EPA storm drain marking program + SDG 6 clean water): 1. Confirm the drain surface is dry and clear of debris. 2. Position the stencil template flat against the curb or grate. 3. Apply the marking paint evenly through the stencil in light coats. 4. Lift the stencil carefully once the paint has set enough to hold shape. 5. Let the marking dry fully before foot or vehicle traffic resumes. 6. Photograph each finished stencil. Done when: Photo of each finished stencil

Where
Downtown Oroville storm drains near Montgomery St, Oroville, CA 95965
Pay
$140 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of each finished stencil

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-08-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)

Bring

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.