Anyone can start here · Host-invited community worship site, T. Nagar, Chennai 600017

Install low-flow fixtures in the washing area at the T. Nagar community worship site

The washing area at a busy host-invited worship site uses full-flow taps that waste water across hundreds of weekly visitors. Swapping in low-flow fixtures cuts that water use without changing how anyone uses the taps. Standard: UN-Habitat/FAO water-efficiency guidance + SDG 6.4 (water-use efficiency). Proof: Photo of installed low-flow fixture + leak-free flow test Method (UN-Habitat/FAO water-efficiency guidance + SDG 6.4 (water-use efficiency).): 1. Confirm the host's invitation and identify the taps to be swapped. 2. Turn off the local water supply to each tap before starting. 3. Remove the existing tap aerator or fixture and install the low-flow replacement. 4. Turn the water back on and check for leaks and flow. 5. Photograph the installed low-flow fixtures and a flow test with GPS and date as proof. Done when: Photo of installed low-flow fixture + leak-free flow test

Where
Host-invited community worship site, T. Nagar, Chennai 600017
Pay
$180 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of installed low-flow fixture + leak-free flow test

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45โ€“90 minutes. Method of record: EPA WaterSense fixture flow-rate + leak audit

Bring

Steps

  1. 1. Confirm the address; get a staff escort; photograph each fixture group.
  2. 2. Measure flow rate at each faucet/shower with the bag-and-timer method; record gallons per minute (gpm).
  3. 3. Test each toilet for leaks with a dye tablet (wait 10 min, check for color in the bowl); record flush volume.
  4. 4. Inspect fixtures, meters, and irrigation for visible leaks/drips; note each.
  5. 5. Read the water meter with all fixtures off; note any movement (indicates a hidden leak).
  6. 6. Rank WaterSense fixture upgrades + leak repairs by estimated water/cost savings.
  7. 7. Record flow rates, leak results, meter check, ranked measures, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.