intermediate work · Invited courtyard, Beirut, Lebanon

Build a kitchen-scrap compost bin for a Beirut courtyard garden

Food scraps from Beirut apartment kitchens go straight into general waste even when a nearby courtyard garden bed could use the finished compost directly — a small bin closes that loop for one building. Standard: FAO organic-waste-to-soil guidance — SDG 12 (Responsible Consumption and Production) & SDG 15 (Life on Land). Proof: Photo of finished bin plus host confirmation. Method (FAO organic-waste-to-soil guidance — SDG 12 (Responsible Consumption and Production) & SDG 15 (Life on Land).): 1. Pick a shaded courtyard corner with host permission. 2. Build or place a simple bin from wood or a perforated container. 3. Add a first layer of dry material. 4. Show the host how to layer future scraps. 5. Photograph the finished bin. Done when: Photo of finished bin plus host confirmation.

Where
Invited courtyard, Beirut, Lebanon
Pay
$220 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of finished bin plus host confirmation.

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 90–360 minutes. Method of record: Compost application per NRCS CPS 336 / CDFA Healthy Soils quantification (rate, quality, incorporation for the site) — finished compost only; assess→apply→verify

Bring

Steps

  1. 1. ASSESS: photograph the application area as found, record GPS boundary and area, and confirm the application rate (tons/acre or inches of depth) and compost quality documentation against the plan.
  2. 2. Calibrate the rate (bucket-per-area or spreader pass test) so the applied depth matches the plan.
  3. 3. Apply compost evenly across the area; keep material out of waterways, drains, and off pavement (sweep any spill back onto soil).
  4. 4. Incorporate or leave surface-applied exactly per the plan (no-till surface application is valid under CPS 336).
  5. 5. VERIFY: photograph the finished application from matching vantage + a depth-check photo (ruler in the applied layer) at ≥3 points; log source, quantity, rate, and date as the application record.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.