Anyone can start here · Invited home, ger district, Ulaanbaatar, Mongolia

Install an interior storm window film kit at an invited Ulaanbaatar ger district home

Single-pane windows in the ger district's small built houses lose heat fast through the glass alone — a shrink-film interior storm window kit adds a second air barrier for the cost of a roll of film. Standard: UNEP cold-climate building-efficiency guidance — SDG 7 (Affordable and Clean Energy). Proof: Before/after photos of the window. Method (UNEP cold-climate building-efficiency guidance — SDG 7 (Affordable and Clean Energy).): 1. Confirm the window with the occupant. 2. Clean the window frame. 3. Apply the double-sided tape frame per kit instructions. 4. Stretch and shrink the film with a low-heat source per kit instructions. 5. Photograph the finished window. Done when: Before/after photos of the window.

Where
Invited home, ger district, Ulaanbaatar, Mongolia
Pay
$140 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Before/after photos of the window.

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-03

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 90–240 minutes. Method of record: Ohio Development Services Agency Home Weatherization Assistance Program (HWAP) — the state pass-through of the DOE Weatherization Assistance Program's cold-climate field protocol: blower-door-directed air sealing toward a CFM50 infiltration target, attic insulation to R-49 / wall cavity to R-13, and mandatory pre/post combustion-safety testing before any tightening closes out.

Bring

Steps

  1. 1. Walk the home with the occupant, note every combustion appliance present, and photograph each nameplate before any work begins.
  2. 2. Set up the calibrated blower door in the main entry and record the baseline CFM50 reading.
  3. 3. Trace and photograph the top infiltration paths with a smoke pencil (rim joist, attic hatch, penetrations, window/door perimeters).
  4. 4. Run the pre-tightening combustion-safety check (ambient CO reading, spillage test at draft hoods) with the blower door off; a failed check stops the job and routes to a licensed HVAC technician before any sealing.
  5. 5. Air-seal the ranked leak paths in order and bring attic insulation to R-49 / accessible wall cavity to R-13 per the HWAP job sheet, maintaining required soffit-to-ridge ventilation.
  6. 6. Re-run the blower-door test to confirm the new CFM50 result.
  7. 7. Run the mandatory post-tightening combustion-safety re-test; a failed re-test stops the job and routes to a licensed HVAC technician for venting correction before further sealing.
  8. 8. Photograph the finished insulation depth and the passed post-tightening combustion-safety check; enter before/after CFM50, materials used, and the combustion-safety result into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.