Anyone can start here · Invited household, Long Bien, Hanoi, Vietnam
Install heat-blocking window film in an invited Long Bien home
Densely packed housing along Long Bien's riverside traps summer heat through the day, and window heat-film is a low-cost way to cut direct solar heat gain for households without budget for cooling. Standard: WHO heat-health guidance for housing; SDG 11.1 (adequate, safe housing). Proof: Finished-window photo, inside and out Method (WHO heat-health guidance for housing; SDG 11.1 (adequate, safe housing).): 1. Confirm the household invitation and clean the window glass. 2. Measure and cut the heat-blocking film to fit the window. 3. Apply the film per the manufacturer's application method. 4. Smooth out bubbles and trim excess edges. 5. Photograph the finished window from inside and outside. Done when: Finished-window photo, inside and out
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 90–240 minutes. Method of record: Urban heat-island mitigation for civic hard surfaces and pedestrian waiting areas — high-solar-reflectance (cool) coatings on sidewalks/schoolyards/plazas and shade-sail/structure installs at bus stops and gathering points. EPA Heat Island Reduction Program cool-pavement guidance + ASTM E1918 solar-reflectance testing; municipal right-of-way permit where the surface or structure sits in the public way.
Bring
- camera + infrared/surface thermometer
- push broom + pressure washer (surface prep)
- roller/squeegee applicators for cool-pavement coating (manufacturer-specified system only)
- cones/barricades for the work-zone perimeter
- post-hole digger or core drill + concrete anchors (shade-structure footings)
- tape measure + level
- gloves + safety glasses + respirator as coating manufacturer specifies
Steps
- 1. Photograph the target surface or waiting area as found, including a mid-day surface-temperature reading, and confirm the right-of-way permit and any utility locates before ground disturbance.
- 2. Set cones/barricades for a pedestrian-safe work zone; pressure-wash and clear the surface of debris, or confirm the shade-structure footing location clears underground utilities (811 locate) and meets the manufacturer's anchor spec.
- 3. Apply the cool-pavement coating system per manufacturer instructions in the specified number of coats and cure time, OR set and anchor the shade structure/sail per its engineering spec, keeping clearances for accessible passage.
- 4. Verify: for coatings, confirm even coverage with no missed sections and let the full cure window pass before reopening to traffic; for structures, confirm anchor torque and structural stability by hand-test.
- 5. Take a matching-vantage after photo and a same-conditions surface-temperature reading; log the reading delta.
- 6. Enter before/after photos, the temperature readings, materials/product used, and the permit reference into the proof record; sign.
If it does not match the plan
- No right-of-way permit on file for public-way work -> STOP: do not apply coating or set a structure until the permit is confirmed.
- 811 utility locate not confirmed before any ground disturbance for a footing -> STOP: reschedule after locates are marked.
- Coating manufacturer's minimum surface-prep or cure-time spec cannot be met (rain in the cure window, surface too degraded) -> reschedule rather than apply out of spec.
What counts as done
- Before and after photos from a matching vantage, with mid-day surface-temperature readings logged both times
- Coating shows even, full coverage with no missed sections (or structure passes a hand-test for anchor stability)
- Pedestrian accessibility/clearance maintained through and after the work
- Right-of-way permit and any utility-locate reference recorded
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.